WA

Wastage Analytics

Production Quality & Waste Management Dashboard

Mail Report

Preview and send the Checked On waste report by email. Section A summarizes closed jobs by month and department; Section B lists high-waste jobs with missing RCA fields from the High Wastage sheet.

FY 2026–27
Report filters

Recipients: ishantrambhad@gmail.com

2026-08-15 β†’ 2026-08-23
Inclusive window 2026-08-15 – 2026-08-23
Download Excel
Closed in period
121
High waste
30
RCA pending
30
Missing fields on High sheet
Verified till 2026-08-23
1416
Closed rows cumulative
A. Closed jobs summary (by month Β· department)

April

DepartmentHighLowTotal
CORRUGATION 4 1 5

May

DepartmentHighLowTotal
CORRUGATION 5 5 10
DUPLEX 1 1 2

Jun

DepartmentHighLowTotal
CORRUGATION 2 8 10
DUPLEX 2 3 5
PAPER BAG 0 1 1

July

DepartmentHighLowTotal
CORRUGATION 10 28 38
DUPLEX 6 12 18
PAPER BAG 0 1 1

Aug

DepartmentHighLowTotal
CORRUGATION 0 4 4
DUPLEX 0 26 26
PAPER BAG 0 1 1
B. High wastage β€” pending RCA responses

Wastage Remark = HIGH and at least one missing: production remark, root cause, prevention, permanent corrective, process waste, operator.

April Β· CORRUGATION (4 jobs)

J/S NoChecked OnClientWaste % Missing Production remarkRoot cause PreventionPermanent corrective Process wasteOperator
357 2026-08-23 Kaps Foods 3.7401574803149606 Process wise wasteOperator name 500 cartons lock bottom beacuse of cresing folding problem and cracking cartons make ready problem, not checked proper repaired the repairable cartons have to make corrected make ready with required cito β€” β€”
376 2026-08-23 Dollar Industries 3.540983606557377 Operator name 300 + 400 sheets punching out and litho pasting problem pasting out problem - litho timing issue in paper feeder seperate the sheets during litho and run sepearately litho feeder work - now work completed 300 + 400 sheets punching out and litho pasting problem β€”
400 2026-08-23 Nashik Bajaj 7.666666666666667 Process wise wasteOperator name 405 cartons major dust problem and color varition problem during printing major dust problem found so machine stopages were more clean dust and run board should be clean and without dust β€” β€”
414 2026-08-23 Bajaj Electricals 8.854166666666666 Root causePrevention actionPermanent Corrective ActionProcess wise wasteOperator name 320 cartons sorting and β€” β€” β€” β€” β€”

May Β· CORRUGATION (5 jobs)

J/S NoChecked OnClientWaste % Missing Production remarkRoot cause PreventionPermanent corrective Process wasteOperator
1089 2026-08-15 BLR Jubilant 1.40876170287935 Root causePrevention actionPermanent Corrective ActionOperator name 385 sheets printing process wastage, 476 sheets litho pasting wastage, run many times on machine β€” β€” β€” 385 sheets printing process wastage, 476 sheets litho pasting wastage, run many times on machine β€”
656 2026-08-15 BLR Eatclub 1.1437908496732025 Process wise wasteOperator name 2200 paper short cutting on reel cutting machine and same short received on printing machine. 2200 sheets short printed, short paper received change the job with short paper job sheets must be modified after received short paper β€” β€”
665 2026-08-15 Ludhiyana Dollar 3.4626506024096386 Root causePrevention actionPermanent Corrective ActionOperator name 352 cartons side pasting process wastage, 470 cartons printing wastage & 400 sheets litho pasting process wastage β€” β€” β€” cartons side pasting process wastage: 352.0 sheets β€”
742 2026-08-23 Dollar Industries 4.487179487179487 Remark by production managerRoot causePrevention actionPermanent Corrective ActionProcess wise wasteOperator name β€” β€” β€” β€” β€” β€”
744 2026-08-23 Dollar Industries 4.769230769230769 Remark by production managerRoot causePrevention actionPermanent Corrective ActionProcess wise wasteOperator name β€” β€” β€” β€” β€” β€”

May Β· DUPLEX (1 jobs)

J/S NoChecked OnClientWaste % Missing Production remarkRoot cause PreventionPermanent corrective Process wasteOperator
1004 2026-08-23 Dollar Industries 4.332865168539326 Remark by production managerRoot causePrevention actionPermanent Corrective ActionProcess wise wasteOperator name β€” β€” β€” β€” β€” β€”

Jun Β· CORRUGATION (2 jobs)

J/S NoChecked OnClientWaste % Missing Production remarkRoot cause PreventionPermanent corrective Process wasteOperator
1281 2026-08-15 Shreeji Chikki 4.996141975308642 Remark by production managerRoot causePrevention actionPermanent Corrective ActionProcess wise wasteOperator name β€” β€” β€” β€” β€” β€”
1508 2026-08-23 BLR Jubilant 3.2957727823191036 Remark by production managerRoot causePrevention actionPermanent Corrective ActionProcess wise wasteOperator name β€” β€” β€” β€” β€” β€”

Jun Β· DUPLEX (2 jobs)

J/S NoChecked OnClientWaste % Missing Production remarkRoot cause PreventionPermanent corrective Process wasteOperator
1309 2026-08-23 Amul Lucknow 5.957854406130268 Remark by production managerRoot causePrevention actionPermanent Corrective ActionProcess wise wasteOperator name β€” β€” β€” β€” β€” β€”
1505 2026-08-23 Metlok Pvt. Ltd. 5.625 Remark by production managerRoot causePrevention actionPermanent Corrective ActionProcess wise wasteOperator name β€” β€” β€” β€” β€” β€”

July Β· CORRUGATION (10 jobs)

J/S NoChecked OnClientWaste % Missing Production remarkRoot cause PreventionPermanent corrective Process wasteOperator
1648 2026-08-15 Arvind Ltd. 13.007246376811594 Root causePrevention actionPermanent Corrective ActionProcess wise wasteOperator name 3551 cartons printing wasatge because of UV problem sorting out β€” β€” β€” β€” β€”
1658 2026-08-15 Ador Welding 2.5848765432098766 Remark by production managerRoot causePrevention actionPermanent Corrective ActionProcess wise wasteOperator name β€” β€” β€” β€” β€” β€”
1732 2026-08-15 Ludhiyana Dollar 4.417989417989418 Root causePrevention actionPermanent Corrective ActionOperator name 545 sheets printing wastage - blue ink correction β€” β€” β€” 545 sheets printing wastage - blue ink correction β€”
1746 2026-08-15 PBS Oil 4.394224733207784 Root causePrevention actionPermanent Corrective ActionOperator name 247 sheets delamiantion problem on litho pasting machine β€” β€” β€” 247 sheets delamiantion problem on litho pasting machine β€”
1761 2026-08-23 Drools Pet Food 3.201923076923077 Remark by production managerRoot causePrevention actionPermanent Corrective ActionProcess wise wasteOperator name β€” β€” β€” β€” β€” β€”
1852 2026-08-15 Dindayal Dollar 2.2817460317460316 Remark by production managerRoot causePrevention actionPermanent Corrective ActionProcess wise wasteOperator name β€” β€” β€” β€” β€” β€”
1897 2026-08-15 Drools Pet Food 3.1904761904761907 Remark by production managerRoot causePrevention actionPermanent Corrective ActionProcess wise wasteOperator name β€” β€” β€” β€” β€” β€”
1905 2026-08-15 Dollar Industries 1.0309278350515463 Remark by production managerRoot causePrevention actionPermanent Corrective ActionProcess wise wasteOperator name β€” β€” β€” β€” β€” β€”
1928 2026-08-15 Dollar Industries 0.8905228758169934 Remark by production managerRoot causePrevention actionPermanent Corrective ActionProcess wise wasteOperator name β€” β€” β€” β€” β€” β€”
1929 2026-08-15 Dollar Industries 1.1363636363636365 Remark by production managerRoot causePrevention actionPermanent Corrective ActionProcess wise wasteOperator name β€” β€” β€” β€” β€” β€”

July Β· DUPLEX (6 jobs)

J/S NoChecked OnClientWaste % Missing Production remarkRoot cause PreventionPermanent corrective Process wasteOperator
1548 2026-08-23 BLR Jubilant 2.5972222222222223 Remark by production managerRoot causePrevention actionPermanent Corrective ActionProcess wise wasteOperator name β€” β€” β€” β€” β€” β€”
1555 2026-08-23 Dollar Industries 4.917279411764706 Remark by production managerRoot causePrevention actionPermanent Corrective ActionProcess wise wasteOperator name β€” β€” β€” β€” β€” β€”
1657 2026-08-23 Britannia BEL Foods 9.766355140186915 Remark by production managerRoot causePrevention actionPermanent Corrective ActionProcess wise wasteOperator name β€” β€” β€” β€” β€” β€”
1691 2026-08-23 Dindayal Dollar 4.194805194805195 Remark by production managerRoot causePrevention actionPermanent Corrective ActionProcess wise wasteOperator name β€” β€” β€” β€” β€” β€”
1888 2026-08-23 Almond House 8.333333333333334 Remark by production managerRoot causePrevention actionPermanent Corrective ActionProcess wise wasteOperator name β€” β€” β€” β€” β€” β€”
1954 2026-08-23 Almond House 6.25 Remark by production managerRoot causePrevention actionPermanent Corrective ActionProcess wise wasteOperator name β€” β€” β€” β€” β€” β€”